Palo Parado Bridge Project
July 2012
July 3, 2012
Storm Water inundates West Abutment Soil Cement Excavation.

July 19, 2012
Re-Bar Cage for to be installed in Drill Shaft
(75 ft long, approximately 7 ft diameter).

July 19, 2012
Drill Rig drilling pier shaft.

July 19, 2012
Soil Cement Batch Plant looking east.